Back to blog

Business InsightsJuly 6, 2025

Japan Food Sanitation Act — Key Facility Requirements Before Opening a Restaurant

By Hiramise Team

Opening a restaurant in Japan requires an operating permit (営業許可) from the prefectural health center. The facility must satisfy requirements under Food Sanitation Act Article 55 and applicable prefectural ordinances. (Source: Ministry of Health, Labour and Welfare)

1. Zone Separation — Contamination Prevention

  • Clean zone: cooking and finished food handling
  • Contaminated zone: receiving and raw ingredient prep
  • Wash/sanitize sink: positioned on the pathway before entering the clean zone
  • No crossing: raw ingredient route and finished dish service route must not cross

2. Plumbing Requirements

  • Potable tap water required (well water needs certified test results)
  • Minimum 2-compartment sink: separate food-prep and dishwashing
  • Grease trap: required by most prefectures
  • Hot water supply: at least 1 sink with hot water recommended

3. Ventilation

  • Exhaust hood above cooking zone mandatory
  • External duct route shown on floor plan
  • Fire Service Act compliance: duct grease cleaning records must be maintained (Act Article 9)
This article is for reference only. Always schedule a pre-consultation (事前相談) with your local prefectural health center before filing. Requirements vary by prefecture.
Business InsightsPublished: July 6, 2025
By Hiramise Team
Japan Food Sanitation Act — Key Facility Requirements Before Opening a Restaurant | Hiramise | Hiramise